High Risk 🌊 Major Dam / Flood Control  ·  California

Napa River Flood Control Project CA

CRITICAL INFRASTRUCTURE RISK PROFILE  ·  CALIFORNIA

7 / 10
Risk Score
Facility Type
🌊 Major Dam / Flood Control
Primary Risk Radius
10
mile zone
Secondary Risk Radius
50
mile zone

// Risk Intelligence

Risk Score7 / 10   High
Facility Type🌊 Major Dam / Flood Control
Operator / BranchUS Army Corps of Engineers
Host CountyNapa County CA
Nearest CityWashington DC
Primary Risk Radius10 miles
Secondary Risk Radius50 miles

// Strategic Significance

The Napa River flood control project is an innovative living levee system that has dramatically reduced flood risk in downtown Napa after devastating floods in 1986 and 1995. The project used setback levees and restored floodplains instead of traditional hard levees. It is considered a national model for urban flood control using natural systems.

// Civilian Impact Assessment

Napa CA with 80,000 residents experienced repeated catastrophic downtown flooding before the project. The wine country economy worth billions depends on flood control for vineyards and the city. The 2014 South Napa earthquake complicated flood infrastructure maintenance.

// Evacuation & Shelter Guidance

SR-29, SR-12, Imola Avenue. Napa County Emergency Management coordinates Napa River flood protocols with the living levee system management.

// Counties Within Risk Zone

// Cities Within Risk Zone